| 1. Name of the Growth Centre |
: |
KANNUR-KANNUR |
| 2. Block/District/State |
: |
Koothuparamba, Kannur District, Kerala State. |
| 3. Name of the implementing agency |
: |
Kerala State Industrial Development Corporation Limited. |
| 4. Approved Cost |
: |
Rs.30 Crores. |
| 5. Extent of land proposed to be acquired |
: |
264 Acre. |
| 6. Present Status of land |
|
|
(a) If in the process of cquisition indicate the present stage and the
likely date of acquisition.
|
: |
The entire land is acquired and possession has been taken over. |
| (b) If acquired, give full details |
: |
Acquired 264 acres of land at Koothuparamba. |
| 7. No. of plots developed and allotted |
: |
106 plots are earmarked for development in phase 1 out of which 37 plots have already been developed and allotted to entrepreneurs. |
| 8. No. of sheds/flatted factories constructed |
: |
Construction of Administrative Block with an area of 1596 Sq. Metres and a multistoried Industrial complex with an area of 7545 Sq. Metres is completed. |
| 9. No. of plots occupied |
: |
22 Plots have been occupied. |
| 10. No. of sheds occupied. |
: |
Nil. |
11. Roads constructed within the Growth Centre (in Kms.)
|
: |
Tenders are being floated for internal roads. |
| 12. Approach roads to Highway (in Kms.) |
: |
Land acquisition for widening the road is in progress and the State Govt. is taking steps to widen and strengthen the road. |
| 13. Water Supply facilities: |
|
|
| (a) Industrial |
: |
The water supply scheme worth Rs.6 Crores is under execution. Construction of overhead water tank is completed. Constructions of pipeline, intake well, water treatment plant are completed. Supply, Erection and Commissioning of D.G.sets in 4 pumping stations completed. Supply, erection and commissioning of Electric motor pump sets is in good progress and is nearing completion. For power supply arrangements to pump sets and D.G.sets, agreement executed and work is in progress.
|
| (b) Domestic |
: |
Installation of Eight Bore wells have been completed. Domestic water supply scheme from bore wells completed. |
| 14. Drainage facilities/effluent system |
: |
Construction to be taken up shortly. |
| 15. Setting up of power distribution station |
: |
KSEB has allocated 630 KVA power and sub station work has been completed. Arrangements for 10 MVA electric power from KSEB are in progress. Preliminary steps to start the work has been taken. Consultancy arranged preparation of estimate, site survey are in progress. Detailed estimate prepared and work is in tendering stage. The above work cannot be taken up due to paucity of fund.
|
| 16. Status of distribution power within the Growth Centre to - |
|
|
| (a) The Industrial Units |
: |
A sub-station is being arranged to be constructed for the 10 MVA power. Steps are being taken for obtaining approval of KSEB. Power obtained for units which have started functioning. |
| (b) Street lights |
: |
110KV/11KV sub-station and Street lighting is being arranged. Work in tendering stage. |
| (c) Domestic Electricity Supply |
: |
11 KV Sub station work is completed and domestic electricity supply shall be made available soon according to necessity. |
| 17. Status of Telecom facilities |
: |
Kept in abeyance. |
18. Development of residential areas
|
|
About 10 acres of land is earmarked for residential purpose. |