Home / Growth Centres / ALAPPUZHA
 
 
Growth Centres - FACILITIES AT IGC, ALAPPUZHA
1. Name of the Growth Centre : ALAPPUZHA - ALAPPUZHA
2. Block/District/State : Cherthala Block, Alappuzha District, Kerala
State.
3. Name of the implementing agency :

Kerala State Industrial Development
Corporation Limited.

4. Approved Cost : Rs.30 Crores.

5. Extent of land proposed to be acquired

: 270 Acres.
6. Present Status of land    

(a) If in the process of acquisition indicate the present stage

:

Land acquisition is in the advanced stage. About 98% of the land has been taken over.

(b) If acquired, give full details : 265 acres already acquired.

7. No. of plots developed and allotted

:

7 Acres of land has been allotted to M/s. Malabar Cements Ltd., a public Undertak ing of Govt. of Kerala. Preparation of detailed estimate for cutting and leveling of re-habilitation area is completed. Work tendered. Tender finalized and agreement executed. Work is in progress. Work is almost completed.

8. No. of sheds/flatted factories constructed

: Nil.
9. No. of plots occupied :

One plot comprising 7 acres. 25 acres of land has been allotted to IHRD for setting up of a new centre of excellence.

10. No. of sheds occupied. : Nil.

11. Roads constructed within the Growth Centre (in Kms.)

:

Shall be undertaken after the entire land is taken over fully. 6 Km road is existing in and around Alappuzha Growth Centre.

12. Approach roads to Highway (in Kms.) :

There is existing approach road from High way to the Growth Centre.

13. Water Supply facilities:    
(a) Industrial :

Arrangements for Industrial water shall be carried out after land acquisition is completed in all respects.

(b) Domestic : Shall be undertaken.

14. Drainage facilities/effluent system

:

This shall be undertaken after taking over the full extent of land.

15. Setting up of power distribution station

: Shall be undertaken later.

16. Status of distribution power within the Growth Centre to -

   
(a) The Industrial Units :

10 MVA Power from KSEB shall be made available for Industrial Units.

(b) Street lights :

Shall be arranged on taking over land completely and after formation of internal roads.

(c) Domestic Electricity Supply : Shall be arranged from KSEB.
17. Status of Telecom facilities :

Action for obtaining telephone connection shall be taken on completion of infrastructure development.

18. Development of residential areas : Not started.
 